Advisory Group for Rail Research and Innovation
Home

Summaries of BR Research Reports
SIGNALLING AND TRAIN CONTROL Back to Subject Index 
Click on the Reference Number for an abstract of the Paper  
Ref No. Title Author(s) Date

TN-SYS-1

APT HEADWAYS THROUGH TEMPORARY SPEED RESTRICTIONS

HOPKINSON J

02/01/1972

TN-ADH-1

OUTDOOR STUDY OF EFFECTS OF INSULATING RUST FILMS ON TRACK CIRCU ITS

KENDALL K;ZOBEL FGR

03/01/1972

TM-AM-2

CALCULATION OF ELECTRICAL ENERGY CONSUMPTION FOR DC RAILWAY SYSTEMS

BOOLS IG;ANDREWS JS

05/01/1974

TN-SIG-2 (A)

RAILWAY SAFETY PRELIMINARY QUANTITATIVE EVALUATION OF THE PERFOR MANCE OF BR.AWS

GELBSTEIN EE

02/01/1975

TM-AM-15

SPEED CONTROL AT JUNCTIONS TO SAVE ENERGY

MILSOM PR;ROBERTS J

08/01/1976

TM-SIG-7

THE USE OF MICROPROCESSORS IN SAFETY SYSTEMS

CRIBBENS AH;NEWING DH;RYLAND HA;

09/01/1976

TM-AM-22

AN ANALYSIS OF ACTUAL ENERGY CONSUMPTION FOR DIFFERENT DRIVING STYLES

MILSOM PR

10/01/1977

TM-AUTO-27

USE OF AXLE MOUNTED TACHOMETER AND END OF SECTION MARKERS FOR DISTANCE MEASUREMENT

THOMAS PD

03/01/1978

TM-AM-24

THE CALCULATION OF TRAIN SPEED PATHS TO SAVE ENERGY

BOOLS IG;HAYNES JB

05/01/1978

TN-AM-1

THE DEVELOPMENT OF TRAIN CONTROL STRATEGIES AND SIMULATION TECHNIQUES FOR COMPLEX RAILWAY NETWORKS

BROCKLEHURST M

06/01/1978

TM-SIG-13

SIGNALLING ON REMOTE SINGLE LINES

FURNISS MJ

02/01/1979

TM-AM-32

THE PREDICTION OF CONFLICTS BETWEEN TRAINS, FOR USE IN TRAIN CONTROL SYSTEMS

STALLYBRASS MO

03/01/1979

TM-AM-34

THE EFFECT ON TRACTION ENERGY CONSUMPTION OF REDUCED STATION WAIT TIMES

HAYNES JB

07/01/1979

TM-SIG-14

AN EXPERIMENTAL RAILWAY SIGNALLING SYSTEM USING MICROPROCESSORS

CRIBBENS AH;FURNISS MJ;RYLAND HA;

10/01/1979

TM-SIG-17

THE USE OF MICROPROCESSORS IN AUTOMATIC TRAIN OPERATION

KEATS W;NEWING DH

10/01/1979

TM-AUTO-20

PROPOSALS FOR LOW COST SIGNALLING SYSTEMS

BIRKIN MS

12/01/1979

TM-AUTO-21

NEW SIGNALLING SYSTEMS - SIMPLIFIED RADIO SIGNALLING SYSTEM

BIRKIN MS

02/01/1980

TM-AUTO-22

NEW SIGNALLING SYSTEMS. RADIO SIGNALLING - EXTENDED DEVELOPMENTS

BIRKIN MS

03/01/1980

TM-AUTO-24

NEW SIGNALLING SYSTEMS - LOW COST RADIO SIGNALLING FOR LIGHTLY TRAFFICKED LINES

BIRKIN MS

06/01/1980

TM-SE-4

ENERGY SAVINGS FROM TRAIN SPEED CONTROL AT JUNCTIONS

BOOLS IG

03/01/1981

TM-SE-007

AUTOMATIC ROUTE SETTING REQUIREMENTS SPECIFICATION

ANNIS A J

10/01/1981

TM-SE-006

ENERGY SAVING AT JUNCTIONS: THE EFFECT OF SIGNAL CLEARING TIME

BROUGH P N

12/01/1981

TM-TC-6

A RADIO DISPATCHING SYSTEM FOR THE EAST SUFFOLK LINE

APPERSON J

03/01/1982

TM-TC-7

BRITISH RAILWAYS AUTOMATIC TRAIN OPERATION - PROJECT TERMINAL REPORT AND DOCUMENTATION GUIDE

EVANS RH

03/01/1982

TM-MIC-5

ADVANCED MICROCOMPUTER TECHNIQUES: FAULT-TOLERANT MICROCOMPUTER SYSTEMS

CRIBBENS AH

05/01/1982

TM-SE-011

THE FORMULATION & TESTING OF A TRAIN REGULATION STRATEGY TO MINIMISE A WEIGHTED COST FUNCTION

HARRISON NG;LAWRENCE PJ

08/01/1982

TM-TAG-112

TECHNICAL POLICY: ADVANCED SIGNALLING AND DYNAMIC NETWORK CONTROL ON BR

GIBSON JG;HARGREAVES SJ

08/01/1985

TM-SE-034

TRAIN COASTING ADVISORY SYSTEM (TCAS) HARDWARE

LUCAS CC

10/01/1985

TM-SE-33

REAL-TIME INFORMATION PROVISION IN AN AREA

LAWRENCE PJ

11/01/1985

TM-SE-32

DEVELOPMENT OF GENERAL TRAIN REGULATION STRATEGIES FOR ARS SYSTEMS - INTERIM REPORT

HURLEY JA;HARRISON NG

01/01/1986

TM-TAG-122

SECONDARY ROUTE SIGNALLING POLICY

WRIGHT SE

09/01/1986

TM-SE-41

TRAIN COASTING ADVICE BY COMPUTER - SUMMARY REPORT OF ECML TESTS

LINDER D

11/01/1986

TR-SE-003

TESTING OF THE 'LISE'TRAIN COASTING SYSTEM ON NETWORK SOUTHEAST

BOOLS I.G.;O'CONNOR N.

04/01/1988

TM-MF-169

EFFECT OF 140 MPH OPERATION ON S&T COMPONENTS

SINCLAIR J.C.

10/01/1988

TM-SE-051

THE EFFECT OF SPEED SUPERVISION ON TRAIN RUNNING PERFORMANCE - PART 1 : DIVERGING JUNCTIONS

WOOD RA

06/01/1989

TM-SE-052

THE EFFECT OF SPEED SUPERVISION ON TRAIN RUNNING PERFORMANCE - PART 2 : PLAIN LINE

WOOD RA

07/01/1989

TM-OCU-1

FUTURE RAILWAY OPERATIONAL CONTROL

K M DAY

04/01/1990

TM-TD-43

MAINTAINING THE VERTICAL GEOMETRY OF S&C: A COMPARISON OF MANUAL METHODS

MATHARU MS

04/01/1990

TM-TD-44

ASSESSMENT OF MID-RANGE TAMPERS FOR MAINTENANCE OF S&C COMPARISON WITH OTHER METHODS

RODERICK J

06/01/1990

TM-MF-188

EFFECT OF HIGH SPEED OPERATION ON S&T COMPONENTS UNDER DIFFERENT SITE CONDITIONS

T M PANG

08/01/1990

RR-VS-1

EFFECTS OF CREEP FORCE AND WHEEL ROUGHNESS ON THE OPERATION OF LOW VOLTAGE DC TRACK CIRCUITS

ARMSTRONG DS

03/01/1991

RR-MF-040

THE RESPONSE OF CLAMP LOCK BODIES TO A CONTROLLED IMPACT

R SMALLWOOD

02/01/1993

RR-SSU-20

TERN INITIAL HAZARDS ANALYSIS

R J S WHELDON

03/01/1994

RR-SSU-21

FAULT TOLERANT CONTROL OF LINESIDE SIGNALLING EQUIPMENT

L MCALLISTER

03/01/1994