![]() |
![]() |
![]() |
![]() |
Advisory Group for Rail Research and Innovation |
Home | ||
| Summaries of BR Research Reports | |
| SIGNALLING AND TRAIN CONTROL | Back to Subject Index |
| Click on the Reference Number for an abstract of the Paper | |
| Ref No. | Title | Author(s) | Date |
| APT HEADWAYS THROUGH TEMPORARY SPEED RESTRICTIONS |
HOPKINSON J |
02/01/1972 |
|
| OUTDOOR STUDY OF EFFECTS OF INSULATING RUST FILMS
ON TRACK CIRCU ITS |
KENDALL K;ZOBEL FGR |
03/01/1972 |
|
| CALCULATION OF ELECTRICAL ENERGY CONSUMPTION FOR
DC RAILWAY SYSTEMS |
BOOLS IG;ANDREWS JS |
05/01/1974 |
|
| RAILWAY SAFETY PRELIMINARY QUANTITATIVE EVALUATION
OF THE PERFOR MANCE OF BR.AWS |
GELBSTEIN EE |
02/01/1975 |
|
| SPEED CONTROL AT JUNCTIONS TO SAVE ENERGY |
MILSOM PR;ROBERTS J |
08/01/1976 |
|
| THE USE OF MICROPROCESSORS IN SAFETY SYSTEMS |
CRIBBENS AH;NEWING DH;RYLAND HA; |
09/01/1976 |
|
| AN ANALYSIS OF ACTUAL ENERGY CONSUMPTION FOR DIFFERENT
DRIVING STYLES |
MILSOM PR |
10/01/1977 |
|
| USE OF AXLE MOUNTED TACHOMETER AND END OF SECTION
MARKERS FOR DISTANCE MEASUREMENT |
THOMAS PD |
03/01/1978 |
|
| THE CALCULATION OF TRAIN SPEED PATHS TO SAVE ENERGY |
BOOLS IG;HAYNES JB |
05/01/1978 |
|
| THE DEVELOPMENT OF TRAIN CONTROL STRATEGIES AND
SIMULATION TECHNIQUES FOR COMPLEX RAILWAY NETWORKS |
BROCKLEHURST M |
06/01/1978 |
|
| SIGNALLING ON REMOTE SINGLE LINES |
FURNISS MJ |
02/01/1979 |
|
| THE PREDICTION OF CONFLICTS BETWEEN TRAINS, FOR
USE IN TRAIN CONTROL SYSTEMS |
STALLYBRASS MO |
03/01/1979 |
|
| THE EFFECT ON TRACTION ENERGY CONSUMPTION OF REDUCED
STATION WAIT TIMES |
HAYNES JB |
07/01/1979 |
|
| AN EXPERIMENTAL RAILWAY SIGNALLING SYSTEM USING
MICROPROCESSORS |
CRIBBENS AH;FURNISS MJ;RYLAND HA; |
10/01/1979 |
|
| THE USE OF MICROPROCESSORS IN AUTOMATIC TRAIN OPERATION |
KEATS W;NEWING DH |
10/01/1979 |
|
| PROPOSALS FOR LOW COST SIGNALLING SYSTEMS |
BIRKIN MS |
12/01/1979 |
|
| NEW SIGNALLING SYSTEMS - SIMPLIFIED RADIO SIGNALLING
SYSTEM |
BIRKIN MS |
02/01/1980 |
|
| NEW SIGNALLING SYSTEMS. RADIO SIGNALLING - EXTENDED
DEVELOPMENTS |
BIRKIN MS |
03/01/1980 |
|
| NEW SIGNALLING SYSTEMS - LOW COST RADIO SIGNALLING
FOR LIGHTLY TRAFFICKED LINES |
BIRKIN MS |
06/01/1980 |
|
| ENERGY SAVINGS FROM TRAIN SPEED CONTROL AT JUNCTIONS |
BOOLS IG |
03/01/1981 |
|
| AUTOMATIC ROUTE SETTING REQUIREMENTS SPECIFICATION |
ANNIS A J |
10/01/1981 |
|
| ENERGY SAVING AT JUNCTIONS: THE EFFECT OF SIGNAL
CLEARING TIME |
BROUGH P N |
12/01/1981 |
|
| A RADIO DISPATCHING SYSTEM FOR THE EAST SUFFOLK
LINE |
APPERSON J |
03/01/1982 |
|
| BRITISH RAILWAYS AUTOMATIC TRAIN OPERATION - PROJECT
TERMINAL REPORT AND DOCUMENTATION GUIDE |
EVANS RH |
03/01/1982 |
|
| ADVANCED MICROCOMPUTER TECHNIQUES: FAULT-TOLERANT
MICROCOMPUTER SYSTEMS |
CRIBBENS AH |
05/01/1982 |
|
| THE FORMULATION & TESTING OF A TRAIN REGULATION
STRATEGY TO MINIMISE A WEIGHTED COST FUNCTION |
HARRISON NG;LAWRENCE PJ |
08/01/1982 |
|
| TECHNICAL POLICY: ADVANCED SIGNALLING AND DYNAMIC
NETWORK CONTROL ON BR |
GIBSON JG;HARGREAVES SJ |
08/01/1985 |
|
| TRAIN COASTING ADVISORY SYSTEM (TCAS) HARDWARE |
LUCAS CC |
10/01/1985 |
|
| REAL-TIME INFORMATION PROVISION IN AN AREA |
LAWRENCE PJ |
11/01/1985 |
|
| DEVELOPMENT OF GENERAL TRAIN REGULATION STRATEGIES
FOR ARS SYSTEMS - INTERIM REPORT |
HURLEY JA;HARRISON NG |
01/01/1986 |
|
| SECONDARY ROUTE SIGNALLING POLICY |
WRIGHT SE |
09/01/1986 |
|
| TRAIN COASTING ADVICE BY COMPUTER - SUMMARY REPORT
OF ECML TESTS |
LINDER D |
11/01/1986 |
|
| TESTING OF THE 'LISE'TRAIN COASTING SYSTEM ON NETWORK
SOUTHEAST |
BOOLS I.G.;O'CONNOR N. |
04/01/1988 |
|
| EFFECT OF 140 MPH OPERATION ON S&T COMPONENTS |
SINCLAIR J.C. |
10/01/1988 |
|
| THE EFFECT OF SPEED SUPERVISION ON TRAIN RUNNING
PERFORMANCE - PART 1 : DIVERGING JUNCTIONS |
WOOD RA |
06/01/1989 |
|
| THE EFFECT OF SPEED SUPERVISION ON TRAIN RUNNING
PERFORMANCE - PART 2 : PLAIN LINE |
WOOD RA |
07/01/1989 |
|
| FUTURE RAILWAY OPERATIONAL CONTROL |
K M DAY |
04/01/1990 |
|
| MAINTAINING THE VERTICAL GEOMETRY OF S&C: A
COMPARISON OF MANUAL METHODS |
MATHARU MS |
04/01/1990 |
|
| ASSESSMENT OF MID-RANGE TAMPERS FOR MAINTENANCE
OF S&C COMPARISON WITH OTHER METHODS |
RODERICK J |
06/01/1990 |
|
| EFFECT OF HIGH SPEED OPERATION ON S&T COMPONENTS
UNDER DIFFERENT SITE CONDITIONS |
T M PANG |
08/01/1990 |
|
| EFFECTS OF CREEP FORCE AND WHEEL ROUGHNESS ON THE
OPERATION OF LOW VOLTAGE DC TRACK CIRCUITS |
ARMSTRONG DS |
03/01/1991 |
|
| THE RESPONSE OF CLAMP LOCK BODIES TO A CONTROLLED
IMPACT |
R SMALLWOOD |
02/01/1993 |
|
| TERN INITIAL HAZARDS ANALYSIS |
R J S WHELDON |
03/01/1994 |
|
| FAULT TOLERANT CONTROL OF LINESIDE SIGNALLING EQUIPMENT |
L MCALLISTER |
03/01/1994 |